WMATA STAP Project (2008)

B&C Transit Inc. is providing installation, testing and commissioning of new non-vital microprocessor equipment (VPI) for non-vital: station stop, and door-dwell control. This equipment is replacing obsolete non-vital relays for station control functions.

NCTD San Diego Sprinter Project (2007)

B&C Transit Inc. designed, furnished, and tested all signal, crossing and communications systems for the new 22.5 mile Sprinter project from Oceanside to Escondido. The project includes Central office System, 15 passenger stations, over 45 grade crossings and tie-ins to existing freight and commuter rail facilities. Beyond track and signal engineering, this project includes paging, intercom, Visual messaging, backbone network equipment, communication cabinets, emergency telephones, CCTV, and security systems.

SF MUNI Muni 3rd Street (2005)

Installation of over 21 miles of fiber optic cabling for the new 3rd street extension. Complete SONET, CCTV, RISS, Emergency telephone in 18 stations so that all services are monitored and controlled from new Muni Maintenance Facility.

Chervon Technology Center (2005)

Design/build installation of Cat 6 cabling, communications room build-out and single mode fiber optic cabling throughout 28 building campus. Upgrade of campus 10BaseT shared Gigabit Ethernet. Facility is the only Petroleum research facility in the Western hemisphere. Project requires team to install network around live petroleum experiments where safety is the only concern.

SAC RT Switch Control (2005)

Provide programming change to 3 on-site VHLC processors to send switch, gate, and signal indications to the IT servers in the Sacramento Light Light control center. Interface these functions into the new GPS tracking system so operators can remotely control switches at those locations and monitor the status of switches, gates, and signals.