MIAMI-DADE COUNTY MIC connector (2010)

The Miami Intermodal Center (MIC)-Earlington Heights Connector is a 2.4-mile, elevated extension of the Miami-Dade Transit (MDT) Metrorail system, from the existing Earlington Heights Station to the new MIC adjacent to Miami International Airport. The project includes a multilevel station at the MIC. For this $260 million Design-Build contract, B&C Transit Inc. has designed an upgrade to the Operations Control Center (OCC). The work, at six major locations, involves systems including CCTV, public address, VMS, telephone, access control, BLS, intrusion detection, SCADA, central software, LAN, and fiber optics.