WMATA AVI Locator Project (2005)

Automatic Car Identification (ACI) – provide design, installation and testing for 50 RF scanners at 23 locations throughout the metro system. Twenty of these locations will utilize wireless radio communications to relay data from the wayside back to OCC (operations control center). The other 3 locations will be hardwired. The collected data will be used to track vehicles along the system which ultimately result in mileage calculations to be used by maintenance and OCC.

MARTA Avondale & Amour Yards (2005)

B&C Transit is designing, furnishing, and installing a computer based control center for both yards. Systems consist of 4 UNIX redundant hot failover servers, 13 workstations and printers, 8 LCD overview monitors,  and 8 video servers over T1 and fiber optic LAN.

SAC RT GPS Tracking (2004)

Completed a 5 monitor stand alone system with graphical representations of the entire Sacramento Light Rail system. The system retrieves GPS latitude, Longitude, Direction, and Speed of rail cars and maps them on the track displays as they move throughout the transit line. This system integrates with a Microsoft SQL database residing on the IT servers.

BART SORS (2003)

Sequential Occupancy Detection System. B&C Transit completed office systems for 24 locations to detect occupancies from MUX inputs and shadow trains with pseudo occupancy (rear end protection) using dynamic logic within redundant system servers at each TCR location. SORS computers integrate with Allen-Bradley PLC’s and send all information to the Central mainframes at BART Central via BARTNET (Ethernet IP) for display on on all BART graphical mainline systems.

BART Airport Extension (2002)

San Francisco Airport Extension Project: B&C Transit provided all personnel required to manage the overall systems integration for Amelco Electric, Inc. as well as integration of a new Bombardier Gealoc systems into an existing Alstom VPI system. B&C also provided the design and software for 6 fully controllable remote access terminals for the ATC system.

BART Daly City Yard (2002)

Daly City Yard Lead Modification Project. B&C Transit provided all design (new and modifications), documentation, project management, and field-testing required to make all modification required to the Daly City Yard.