San Francisco Airport Extension Project: B&C Transit provided all personnel required to manage the overall systems integration for Amelco Electric, Inc. as well as integration of a new Bombardier Gealoc systems into an existing Alstom VPI system. B&C also provided the design and software for 6 fully controllable remote access terminals for the ATC system.
SAN FRANCISCO BART Daly City Yard (2002)
Daly City Yard Lead Modification Project. B&C Transit provided all design (new and modifications), documentation, project management, and field-testing required to make all modification required to the Daly City Yard.
SAN FRANCISCO BART Hayward Yard (2002)
Hayward Yard Track Improvements. B&C Transit provided all design (new and modifications), documentation, project management, and field-testing required to the Hayward Yard.
SAN FRANCISCO BART Concord Yard Expansion (2001)
B&C Transit provide all design, documentation, project management, and field-testing required to the Concord Yard.
NEW YORK NYCTA US&S 63rd Street Rehab Project (2001)
B&C Transit provided all personnel to supervise installation, conduct field surveys, make all field design modifications, and perform all commissioning testing for US&S Inc.
ATLANTA MARTA US&S Extension (2000)
B&C provided all engineering services (design and commissioning) for the modifications to the Alstom vital and non-vital processors.
WASHINGTON D.C. WMATA F-Line Extension (2000)
B&C provided all field personnel required to commission the WMATA F-Line for Alstom Signaling.
NEW YORK NYCTA Seabeach Line (1999)
B&C provided all field personnel required to commission the Seabeach Line for Alstom Signaling.
SAN FRANCISCO BART DPX & CPX (1998)
B&C provided a resident engineer required to commission BART’s DPX and CPX extensions for Alstom Signaling Los Angeles MTA.
TAIPEI ALSTOM Taipei Blue Line (1999)
B&C provided all field personnel required to commission the Taipei Blue Line for Alstom Signaling.

