Chervon Technology Center (2005)

Design/build installation of Cat 6 cabling, communications room build-out and single mode fiber optic cabling throughout 28 building campus. Upgrade of campus 10BaseT shared Gigabit Ethernet. Facility is the only Petroleum research facility in the Western hemisphere. Project requires team to install network around live petroleum experiments where safety is the only concern.

SAC RT Switch Control (2005)

Provide programming change to 3 on-site VHLC processors to send switch, gate, and signal indications to the IT servers in the Sacramento Light Light control center. Interface these functions into the new GPS tracking system so operators can remotely control switches at those locations and monitor the status of switches, gates, and signals.

WMATA AVI Locator Project (2005)

Automatic Car Identification (ACI) – provide design, installation and testing for 50 RF scanners at 23 locations throughout the metro system. Twenty of these locations will utilize wireless radio communications to relay data from the wayside back to OCC (operations control center). The other 3 locations will be hardwired. The collected data will be used[…]